Markets

Technologies > Computer Centers

A Major US Insurance Company

Dallas, TX

Data Center
250,000 SqFt
1 Million Gallon Thermal Storage
4 - 600 Ton Chiller
Dual Secondary Loop
Concrete Cooling Towers
Two (N+) Design
DDC/Newtork Automation
Six 2,000 kVA 15 kV Generators
Paralleling Controls
10,000 kVA Total Load
Automated Electrical Distribution
SCADA Monitoring & Control
13,800 Volt Service



A Major US Insurance Company

Pheonix, AZ

Data Center
250,000 SqFt
1 Million Gallon Thermal Storage
Four 600 Ton Chiller
Dual Secondary Loop
Concrete cooling towers
Two (N+) Design
DDC/Newtork Automation
Six 2,000 kVA 15 kV Generators
Paralleling Controls
10,000 kVA Total Load
Automated Electrical Distribution
SCADA Monitoring & Control
13,800 Volt Service



A Major US Insurance Company

Alpharetta, GA

Data Center
250,000 SqFt
1 Million Gallon Thermal Storage
Four 600 Ton Chiller
Dual Secondary Loop
Concrete Cooling Towers
Two (N+) Design
DDC/Newtork Automation
Six 2,000 kVA 15 kV Generators
Paralleling Controls
10,000 kVA Total Load
Automated Electrical Distribution
SCADA Monitoring & Control
13,800 Volt Service



A Major US Insurance Company

Bloomington, FL

Data Center
Total Facility: 1,000,000 SqFt
Raised Floor: 500,000 SqFt
Redundant 12.47 kV Utility Sources
2,600 kVA of Rotary UPS



AOL Manassas Data Center

Manassas, VA

Generator Capacity: 20 MW
Service Voltage: 480 V
Square Feet: 100,000 SF raised floor
160,000 Gal of Fuel Oil Storage
Raised floor: 100,000 SqFt
Six 820ton chillers and a 600,000 gal thermal storage tank
Three 1750 kVA Rotary UPS modules
Eighteen 750 kVA Static modules



AT&T Alpharetta Facility

Alpharetta, GA

Generator Capacity: 16 MW
Service Voltage: 12.47 kV
Total Facility: 432,000 SqFt
Raised Floor: 432,000 SqFt
Service Voltage: 12.47 kV
16 Standby Generators Totaling 26.6 MW
3,000 Tons of Cooling



AT&T Data Center

Alpharetta, GA

Six 1500 KW Generators



AT&T Data Center Expansion

Alpharetta, GA



AT&T Web Hosting

Atlanta, GA

245,000 SqFt
Generator Capacity: 12,000 KW
Raised Floor: 68,000 SqFt
Utility kVA Capacity of 13,200 Redundant
UPS kVA Capacity of 26,400 Static
60 PDU STS with 225 kVA Distribution



Cingular Data Center

Alpharetta, GA



Contel Data Center

Alpharetta, GA

Three 1500 KW Generators



E*Trade

Alpharetta, GA

Chiller Tonage: 2,400 Tons
Service Voltage: 12.47kV
Generator Capacity: 12,000 KW
Raised Floor: 100,000 Sq. Ft.
10 MVA Total Load, 5 MVA Critical Load
500/750/1000 Watt/M2 Load Density
Eight 750 kVA Static UPS Modules
Dual Parallel Redundant System
Two (N+1) Design
Four 2,500 kVA Generators
Four 600 Ton Centrifugal Chillers
Two 5,000 M2 Raised Floor Area
Complete SCADA Automation



Equafax Data Center

Alpharetta, GA



Global Media Distribution

Herndon, VA



Hewlett Packard Data Center

Atlanta, GA

Four 1500 KW Generators



HP Information Technology

Atlanta, GA

Two 1500 KW Generators



MCI Switching Center

Atlanta, GA

Raised Floor: 15,000 SqFt
Full Capacity Standby Generator Plant
Full Capacity AC and DC Distribution Plant



McKesson HBOC

Alpharetta, GA

170,000 SqFt



Optiglobe Buenos Aires

Buenos Aires, Brazil

Chiller Tonage: 2,000 Tons
Service Voltage: 12.47kV
Generator Capacity: 12,000 KW
Raised Floor: 75,000 SqFt
Six 2000 kW Engine Generators
9,600 kVA Total Available UPS Capacity
1.28 Million Gallon CHW Water Storage Tank
348,280 Gallon CDW Storage Tank
60,000 Gallons On-Site Fuel Storage
Four 675 Ton Centrifugal Chillers
SCADA Building Automation System
15 kV Dual Primary Service



Optiglobe Rio de Janeiro

Rio de Janeiro, Brazil

200,000 SqFt
Generator Capacity: 12 MW
Chiller Tonage: 2,000 Tons
Service Voltage: 12.47kV
Raised Floor: 75,000 SqFt
Six 2000 kW Engine Generators
9,600 kVA Total Available UPS Capacity
1.28 Million Gallon CHW Water Storage Tank
348,280 Gallon CDW Storage Tank
60,000 Gallons On-Site Fuel Storage
Four 675 Ton Centrifugal Chillers
SCADA Building Automation System
15 kV Dual Primary Service



QTS Data Center

Suwannee, GA

Chiller Tonage: 6,000 Tons
Service Voltage: 12.47kV
Generator Capacity: 24,000 KW
Facility: 370,000 SqFt
Raised Floor: 175,000 SqFt
Utility Capacity: 60,000 kVA Redundant
Distribution Voltage: 12.47 kV and 480Vac
32,400 kVA Rotary UPS Capacity
24,000 kW Standby Generator Plant Capacity
45-135 PDU's
Completed in 10 months



Target Technology Center

Minneapolis, MN



Travelers Data Center

Norcross, GA

Five 1500 KW Generators



United Parcel Service Data Center

Alpharetta, GA



Wachovia Silas Creek Data Center

Silas Creek, NC

170,000 SqFt
Chiller Tonage: 4,600 Tons
Service Voltage: 12.47kV
Generator Capacity: 18,000 KW
Raised Floor: 110,000 SqFt
Six 2,000 kW Engine Generators
Twelve 1,000 kVA UPS Modules
Six 820 Ton Centrifugal Chillers
150,000 Gallon Chilled Water Tank
680,000 Gallon Condenser Water Tank
80,000 Gallon Fuel Oil Tank
Completed in 10 months