 | Macon, GA |
| $72 Million Project
New 60 MGD Water Treatment Plant
Initial Capacity, Including Raw Water Metering and Chemical Addition:
- Four Flocculator Trains
- Four Sedimentation Basins
- Ten Deep Bed Filters
- Two 20 MGD and Two 15 MGD Finished Water Pumps
- Solids Handling System, Including Two Backwash Surge Tanks
- Thickened Sludge Pump Stations
- Filter Press Building Housing Two Plate and Frame Filter Presses
- Emergency Power System with Generators and Switchgear
- Administration Building and Associated Underground Distribution
- Complete Plant Wide Instrumentation.
|