 | Columbus, GA |
| $60 Million facility
Most Technologically and Environmentally Advanced Battery Recycling Plant in the World
Recycling Capacity is 9 Million Batteries Per Year (30,000 Per Day)
GNB Construction Statistics
- Construction Labor: Peaked at 338 Construction Workers at Two 10 Hour Shifts 6 Days/Week
- Concrete: 13,355 Cubic Yards at 1,400 Truckloads
- Structural & Misc. Steel: 150 Truckloads
- Electrical: Large KVA Service to Power 3,000 Homes, 121 Miles of Power Wiring
- Controls & Instrumentation: 2,100 Computerized Control Points, 500 Non-Computerized Control Points, 333 Miles of Control Wiring, 2 miles of Control Tubing
- Gas Burners: Enough to Heat 1,500 Homes During Heating Season
- Piping: 6 Miles of Process and Utility Piping
- Air Systems: 400,000 CFM-Equivalent to Air Quality Required to Air Condition 500,000 SqFt Office Tower
- Pumps: 95 Process and Utility Pumps
- Conveyors: 5,300 Linear Feet (1 mile) of Conveying Systems
|